Vaillant Ecotec Pro 28 Installation Guide: A Comprehensive Plan
This guide details the complete installation process for the Vaillant Ecotec Pro 28, ensuring safe and efficient operation.
It references the user manual for feature understanding and proper functionality.
The Vaillant Ecotec Pro 28 is a highly efficient, modern condensing boiler designed for central heating and domestic hot water. This guide provides a detailed walkthrough of its installation, referencing the comprehensive Vaillant Ecotec Pro 28 User Manual for complete understanding.
Understanding the boiler’s features and functionality, as outlined in the manual, is crucial for a successful installation. The Ecotec Pro 28 boasts advanced technology, offering reliable performance and reduced energy consumption. This installation guide aims to equip installers with the necessary knowledge to safely and effectively integrate this boiler into various heating systems. Proper installation ensures optimal performance and longevity, maximizing the benefits of this advanced heating solution.
Safety Precautions & Warnings
Prior to commencing installation, strict adherence to safety protocols is paramount. Always disconnect the gas and electrical supplies before working on the Vaillant Ecotec Pro 28. Qualified and certified personnel must perform the installation, adhering to local regulations and manufacturer’s guidelines.
Wear appropriate personal protective equipment (PPE), including safety glasses and gloves. Be mindful of hot surfaces and potential electrical hazards. Ensure adequate ventilation during installation, particularly when working with gas connections. Improper installation can lead to carbon monoxide poisoning, fire, or explosion. Refer to the Vaillant Ecotec Pro 28 User Manual for detailed safety information and warnings. Ignoring these precautions can void the warranty and compromise safety.
Unboxing and Component Check
Carefully unpack the Vaillant Ecotec Pro 28 from its packaging, ensuring no damage occurred during transit. Verify all listed components are present, referencing the packing list included within the box. These typically include the boiler unit, flue components, mounting bracket, and documentation like the Vaillant Ecotec Pro 28 User Manual.
Inspect each component for any visible signs of damage – dents, cracks, or missing parts. Document any discrepancies immediately with photographs and contact your supplier. Do not proceed with installation if any components are damaged or missing. Retain all packaging materials until the installation is complete and you are satisfied with the condition of the unit.
Identifying Key Components
Essential components of the Vaillant Ecotec Pro 28 include the boiler casing, heat exchanger, gas valve, fan, pump, and control unit. The User Manual details each part’s function. Locate the flue outlet, gas inlet, and plumbing connections – these are crucial for subsequent steps.
Familiarize yourself with the control panel and its various buttons and displays. Identify the condensate trap and its connection point. The mounting bracket is vital for secure wall installation. Understanding these key components, as outlined in the Vaillant Ecotec Pro Manual, will streamline the installation process and ensure correct assembly. Proper identification prevents errors and promotes safe operation.
Checking for Damage During Transit
Upon delivery, carefully inspect the Vaillant Ecotec Pro 28 for any signs of damage incurred during transit. Examine the boiler casing for dents, scratches, or cracks. Verify the integrity of all visible components, including the heat exchanger and gas valve.

Check the packaging for evidence of rough handling or impact. Document any damage with photographs before unpacking. Compare the received components against the packing list to ensure everything is present. If damage is detected, immediately notify the carrier and the supplier, referencing the Vaillant Ecotec Pro Manual for reporting procedures. Do not install a damaged unit.
System Requirements & Pre-Installation Checks

Before commencing the Vaillant Ecotec Pro 28 installation, several crucial pre-installation checks are essential. Confirm your central heating system is compatible and appropriately sized for the boiler’s 28kW output. Assess the existing pipework for corrosion or leaks, planning for necessary upgrades.
Verify adequate ventilation in the installation location, adhering to local regulations. Ensure the flue route complies with current standards. Check gas and electrical supplies meet the boiler’s requirements, detailed in the Vaillant Ecotec Pro Manual. Confirm a suitable condensate drain is available, preventing potential issues.
Gas Supply Requirements
The Vaillant Ecotec Pro 28 requires a gas supply conforming to relevant national standards. Ensure the gas supply pipe is sized correctly to deliver the boiler’s gas consumption rate, preventing pressure drops. A Gas Safe registered engineer must verify the supply’s integrity and perform a gas tightness test.
Confirm the gas supply pressure falls within the boiler’s specified operating range, detailed in the Vaillant Ecotec Pro Manual. Install a gas filter upstream of the boiler to protect sensitive components from debris. Proper gas connection is vital for safe and efficient operation, adhering to all safety regulations.
Electrical Supply Requirements
The Vaillant Ecotec Pro 28 demands a dedicated 230V AC electrical supply, correctly earthed and protected by a suitable fuse. Verify the electrical supply meets the boiler’s power consumption specifications, outlined in the Vaillant Ecotec Pro Manual. A qualified electrician must perform all electrical connections, adhering to local wiring regulations.
Ensure the electrical supply cable is of adequate size to handle the boiler’s current draw, preventing overheating. Install an isolating switch near the boiler for safe maintenance and emergency shut-off. Proper electrical grounding is crucial for safety and preventing electrical shock, following all safety guidelines;
Condensate Drain Requirements
The Vaillant Ecotec Pro 28, being a condensing boiler, produces acidic condensate that requires a dedicated drain line. This line must be constructed from corrosion-resistant material, like PVC, and installed with a continuous downward slope to facilitate drainage. Avoid sharp bends or restrictions that could cause blockages.
The condensate drain should terminate in a suitable location, such as a foul water drain, ensuring it’s protected from freezing during colder months. Refer to local regulations regarding condensate disposal. Proper installation prevents damage and ensures efficient boiler operation, as detailed in the Vaillant Ecotec Pro Manual.
Wall Mounting & Boiler Positioning

Securely mounting the Vaillant Ecotec Pro 28 is crucial for safe operation. Choose a load-bearing wall capable of supporting the boiler’s weight, both when full of water and during maintenance. Ensure adequate space around the unit for servicing and flue connections, adhering to manufacturer’s guidelines.
Maintain clearances as specified in the installation manual to allow for proper ventilation and access. Consider proximity to gas and water services to minimize pipe runs. The boiler should be positioned to facilitate easy access for future maintenance, as highlighted in the Vaillant Ecotec Pro Manual. Use appropriate wall fixings for the wall type.
Flue Installation – Types & Regulations
Flue installation for the Vaillant Ecotec Pro 28 must strictly adhere to local building regulations and manufacturer’s instructions. Two common types are concentric and twin flue systems. Concentric flues feature a pipe-within-a-pipe design for air intake and exhaust, while twin flues use separate pipes.
Regulations dictate flue material, diameter, length, and termination position to ensure safe combustion and prevent carbon monoxide poisoning. Proper sealing of flue joints is vital to prevent leaks. Consult the Vaillant Ecotec Pro Manual for specific flue kit compatibility and installation details. Incorrect flue installation voids the warranty and poses a serious safety risk.
Concentric Flue Systems

Concentric flue systems, commonly used with the Vaillant Ecotec Pro 28, offer a streamlined installation. They comprise an inner exhaust pipe and an outer air intake pipe, sharing a common outer casing. This design minimizes visual impact and simplifies wall penetration.
Installation requires careful attention to correct sizing and slope for condensate drainage. Ensure the outer air intake isn’t obstructed, guaranteeing sufficient combustion air. Sealing all joints with approved sealant is crucial to prevent flue gas leakage. Refer to the Vaillant Ecotec Pro Manual for specific concentric flue kit options and detailed fitting instructions. Proper installation ensures efficient and safe boiler operation.

Twin Flue Systems
Twin flue systems for the Vaillant Ecotec Pro 28 utilize separate flues for exhaust gases and air intake, offering flexibility in installation scenarios. This configuration is particularly suitable when longer flue runs or challenging routing are necessary. Correct sizing of both flues is paramount for optimal performance and safety.
Installation demands meticulous sealing of all connections to prevent gas leakage and ensure proper combustion. Adherence to local regulations regarding flue termination positions is essential. Consult the Vaillant Ecotec Pro Manual for approved twin flue kit specifications and detailed guidance. Regular inspection of the twin flue system is recommended to maintain efficiency and prevent potential hazards.
Gas Connection Procedure
The gas connection to the Vaillant Ecotec Pro 28 must be performed by a Gas Safe registered engineer, adhering strictly to local gas regulations. Prior to connection, verify the gas supply pressure matches the boiler’s requirements, detailed in the installation manual. Ensure the gas supply pipework is adequately sized and free from leaks using a suitable leak detection fluid.
Install a gas shut-off valve upstream of the boiler for isolation during maintenance. Employ appropriate gas-tight fittings and jointing compounds. After connection, conduct a thorough gas tightness test, documenting the results. Refer to the Vaillant Ecotec Pro Manual for specific gas connection details and safety precautions.
Plumbing Connections – Hot & Cold Water
Establish connections for both hot and cold water supplies using appropriate copper or plastic plumbing. Ensure the cold water inlet pressure aligns with the boiler’s specifications, typically between 1.5 and 5 bar. Utilize flexible hoses or rigid pipework, ensuring secure and leak-proof joints. Install a balanced flue system, adhering to regulations.

Fit a strainer on the cold water inlet to prevent debris from entering the boiler. Connect the hot water outlet to the existing hot water system, incorporating appropriate isolation valves. Thoroughly flush the system to remove any contaminants before commissioning. Consult the Vaillant Ecotec Pro Manual for detailed plumbing diagrams and best practices.
Electrical Connections & Wiring Diagram
Prior to any electrical work, ensure the main power supply is isolated. Refer to the Vaillant Ecotec Pro 28 Manual for the precise wiring diagram, as configurations can vary. Connect the power cable via the designated terminal block, observing correct polarity – live, neutral, and earth. Utilize a suitably rated fused spur, typically 3A, for the boiler’s power supply.
Implement appropriate earthing to comply with current regulations. Consider external control connections, such as thermostats or time switches, following the wiring diagram. Double-check all connections for tightness and security. Verify the voltage matches the boiler’s requirements before restoring power. Always adhere to local electrical safety standards.

Filling & Purging the System
Begin by ensuring all radiator valves are open and the system is fully vented. Connect a filling loop to the system, utilizing the designated filling and drain points. Slowly introduce water into the system, monitoring the pressure gauge on the Vaillant Ecotec Pro 28. Aim for a pressure between 1 and 1.5 bar when cold.
Once filled, bleed all radiators to release trapped air. Repeat the filling process as needed to maintain the correct pressure. After bleeding, re-check the pressure. Utilize a powerflush if the system contains debris. Purge any remaining air from the boiler heat exchanger following the manual’s instructions.
Initial Start-Up & System Testing
Following successful filling and purging, power on the Vaillant Ecotec Pro 28. Observe the control panel for any immediate error codes; Initiate the boiler’s start-up sequence as detailed in the user manual. Monitor the heating cycle, verifying hot water production and radiator temperature.
Check for leaks around all connections – gas, water, and flue. Confirm the flue is operating correctly with proper gas analysis. Test the safety devices, including the overheat thermostat and pressure relief valve. Verify the system pressure remains stable during operation. Document all test results for commissioning.
Control Panel & User Interface Overview
The Vaillant Ecotec Pro 28 features a user-friendly interface for operation and diagnostics. The display shows current temperature settings, operating mode (heating, hot water, off), and any active error codes. Buttons allow adjustment of temperature, mode selection, and access to advanced settings.
Navigating the menu system, detailed in the user manual, enables customization of heating schedules and system parameters. Understanding the indicator lights provides quick status updates. Familiarize yourself with the reset procedure for addressing minor faults. The interface facilitates efficient control and monitoring of the boiler’s performance.
Error Codes & Troubleshooting
The Vaillant Ecotec Pro 28 utilizes error codes to signal system faults, detailed in the user manual. Common issues include low water pressure, flame failure, or gas supply problems. Error code displays on the control panel guide diagnosis. Simple fixes, like resetting the boiler, may resolve minor errors.
However, persistent codes require professional attention. Troubleshooting steps involve checking gas supply, water pressure, and flue connections. Never attempt repairs without proper training. Refer to the manual for specific code meanings and recommended actions. Ignoring errors can lead to system damage or unsafe operation; always prioritize safety.
Commissioning Checklist & Documentation
Upon installation, a thorough commissioning process is vital for optimal performance of the Vaillant Ecotec Pro 28. A detailed checklist confirms all connections – gas, water, and electrical – are secure and compliant. Verify correct flue operation and condensate drainage. System pressure must be within specified limits, and the boiler should cycle correctly through heating and hot water modes.
Complete all required documentation, including the installation date, engineer details, and gas safety certificate. Retain the user manual for future reference. Proper documentation ensures warranty validity and facilitates future servicing. Record any initial error codes or adjustments made during commissioning.

Regular Maintenance & Servicing
To maintain peak efficiency and longevity of your Vaillant Ecotec Pro 28, regular maintenance is crucial. Annual servicing by a qualified Gas Safe registered engineer is highly recommended. Servicing includes a thorough inspection of components, cleaning of the heat exchanger, and combustion analysis. Check the system pressure regularly and address any leaks promptly.
Inspect the flue for blockages or damage. Ensure condensate drain is clear to prevent issues. Following the manufacturer’s guidelines extends the boiler’s lifespan and minimizes potential breakdowns. Keep records of all servicing and maintenance performed for warranty purposes and future reference.
Vaillant Ecotec Pro 28 – Technical Specifications
The Vaillant Ecotec Pro 28 boasts impressive technical features. Its output ranges from 3.3kW to 28kW, suitable for medium-sized homes. It features a compact design with dimensions of 700mm x 400mm x 290mm. The boiler operates on natural gas and requires a 230V electrical supply. Its efficiency rating is 92%+, ensuring low energy consumption.

The hot water flow rate is 13.7 l/min. It has a central heating flow temperature of up to 82°C. The boiler’s weight is approximately 34kg. These specifications are vital for installers to ensure correct system design and optimal performance, referencing the user manual for detailed information.